Freedom Metro Trail 7.JPG

Freedom Metro Trail

The 11-mile Freedom Metro Trail officially begins in front of the beach house at Lake Saint Clair Metropark. The Metropark also boasts some nice paved trails within the park that guide you along the water's edge to Point Huron. The trail travels along the south side of the Metro Parkway (16 Mile Road) and officially ends at Schoenherr Road. When you cross under the 1-94 interchange, the trail intersects with the middle of the Clinton River Spillway Bike Path, which runs along the edge of the waterway about 2.5 miles from Mount Clemens to Lake Saint Clair (a fun side trip worth exploring). Most of the major street crossings offer protected crossing signals plus a bike-friendly pedestrian bridge over Groesbeck Highway.

Sterling Heights Connector

At the west end of the Freedom Metro Trail, cross over to the west side of Schoenherr Road and proceed north on a paved urban pathway that provides safe passage to Dodge Park. This connector trail travels about 3 miles along the west side of Schoenherr Road and the south side of Utica Road to Dodge Park.

Dodge Park to River Bends Park

Ride, hike or run over 8 miles of paved non-motorized trails that meander along (or near) the edge of the Clinton River through Dodge Park, Clinton River Park, Clinton River Heritage Park, downtown Utica, Memorial Park and River Bends Park. This is a very scenic stretch of trail that we highly recommend.

If you only want to ride this 8-mile section of trail, we suggest starting your journey at River Bends Park or the Clinton River Park Trailhead on Edison Street south of Clinton River Road. The newest section of trail from downtown Utica to River Bends Park was completed in 2015 and nicely designed. Construction will resume this summer on two segments of paved trail that will eventually connect the trail in River Bends Park to the Macomb Orchard Trail, running through Gene Shepherd Park and Holland Ponds Park in Shelby Township.

River Bends Park to Lake Saint Clair Trail

Explore a growing network of over 22 miles of continuous paved trails that follow the Clinton River basin from River Bends Park to Lake Saint Clair. We began our ride at Lake Saint Clair Metropark and rode to River Bends Park and back; a fairly flat and easy ride, with a stop in downtown Utica for lunch.

Read Less Text...

Trail Maps

Get a Map Download a Map
As seen in Michigan Trails Magazine.

Freedom Metro Trail PDF Map

Googleâ„¢ Map Link

Newsletter Signup

Michigan Trails News In Your Email. Periodic newsletters with late-breaking stories and trails updates. We won't share your email address with anyone else.

Your Name:
Your Email:
Validation Code:
Enter Code:  (ALL CAPS)

Trail Resource Guide

Bicycle & Fitness Shops
American Cycle & Fitness American Cycle & Fitness
18517 Hall Road
Macomb Township, MI 48044
(586) 416-1000
Web Link
Bikes Blades & Boards Bikes Blades & Boards
17060 Mack Avenue
Grosse Point, MI 48230
(313) 885-1300
Web Link
Metro Bike
46575 Hayes
Shelby Township, MI 48315
(586) 799-7799
Trail Groups and Developers
Macomb County Department of Roads Macomb County Department of Roads
1 south Main Street 7th Floor
Mt. Clemens, MI 48043
(586) 493-5137
Web Link
Michigan Department of Natural Resources Michigan Department of Natural Resources
525 W. Allegan Street
Lansing, MI 48909

Web Link
Michigan Trails & Greenways Alliance Michigan Trails & Greenways Alliance
PO Box 27187
Lansing, MI 48909
(517) 485-6022
Web Link
Tourist Information
Huron-Clinton Metropolitan Authority Huron-Clinton Metropolitan Authority
13000 High Ridge Drive
Brighton, MI 48114-9058
1-800-477-2757
Web Link
Trail Supporter
DTE Energy DTE Energy



Web Link
League of Michigan Bicyclists League of Michigan Bicyclists
416 S. Cedar Street, Suite A
Lansing, MI 48912
(517) 334-9100
Web Link
Michigan Brewers Guild Michigan Brewers Guild
225 W. Washtenaw, Suite C
Lansing, MI 48933

Web Link
Sinas Dramis Law Firm Sinas Dramis Law Firm
3380 Pine Tree Road
Lansing, MI 48911
(517) 394-7500
Web Link